Standard configurations · continental US

Manual transfer switchesdelivered in 4 weeks.

Manual transfer switches to 1200 A with integral cam-lock generator connectors, and enclosed service entrance breakers to 2000 A. ABB breakers, fully rated bus, service entrance rated, UL listed. We try to keep them in stock, so most orders are on site in well under four weeks. Four weeks is the outside number, not the usual one.

The gap

Same equipment. Forty-six weeks of difference.

A standard unit from a mainstream supplier is quoted at forty to fifty weeks, because it is not built until it is ordered. That number does not stay inside the switchgear line item — it sets your energization date, and the energization date sets everything after it.

Weeks from release to delivered on site

Mainstream supplierStandard manual transfer switch
40–50weeks
Danbar Power SolutionsSame standard configurations, from stock
4weeks or less
  • 46Weeks earlier

    Against the top of the market range. The generator connection stops being the thing that holds up energization.

  • 10×Schedule compression

    Four weeks instead of forty, at worst, because the unit already exists. Same specifications, same ratings, same listing.

  • 24 hrsTo a confirmed ship date

    Not a callback, not a discovery meeting. A date by email within one business day of the request.

Why four is possible

We keep them in stock.

That is the whole answer. The forty-week number is a queue, not a build — a one-off waits behind a national backlog before anyone touches it. We do not order these after you do. We carry the standard configurations on the shelf, because we have watched what a forty-week switchgear quote does to a schedule, and we would rather hold the inventory than let the generator connection be the thing that moves your energization date.

Four weeks is the outside number, not the usual one. When the shelf has your configuration on it — which is almost always — you get it well inside four weeks. In a genuinely busy stretch, when stock has to be replenished, it can run the full four. That is the honest range, and the slow end of it still beats the market by ten to one.

Where the four weeks does not apply. Genuinely bespoke work is bespoke work, and it gets a real date instead of this one. The four weeks covers the standard configurations published below, delivered anywhere in the continental US.

Integral generator connection

The generator connection is part of the build.

The cam-lock inlets are not an accessory bolted on afterward. Series 16 connectors are mounted on the switch and bus-barred inside the enclosure before it ships — ten inlets on the 600, fifteen on the 1200, rated 400 A each. What arrives on your site is one piece of gear that the generator plugs directly into.

No separate connection box

No docking station or tap box to specify, buy, wait for, or find wall space for. It is one purchase order line and one enclosure.

No conduit, no feeder

Nothing to run between a connection box and the switch. The conduit, the fittings, and the labor to pull that feeder all come off the estimate.

Nothing to mis-wire

That leg is terminated and tested at the shop, not on a ladder at two in the morning. Phase rotation is right because it was made right.

What we sell

Three configurations. Pick one and order it.

Every specification is published on this site. Nothing here needs a discovery call before you can put it on a purchase order.

600 A / 480 V manual transfer switch

3Ø · 10 cam-lock inlets · 4 weeks

  • 480Y/277 V, 4-wire wye or 480 V, 3-wire delta
  • Integral Series 16 cam-lock, 2 rows × 5
  • Mechanically interlocked, service entrance rated
  • NEMA 1 / 3R / 4X
Full specifications →

1200 A / 208 V manual transfer switch

3Ø · 15 cam-lock inlets · 4 weeks

  • 208Y/120 V, 4-wire wye
  • Integral Series 16 cam-lock, 3 rows × 5
  • Mechanically interlocked, service entrance rated
  • NEMA 1 / 3R / 4X
Full specifications →

Enclosed service entrance breakers

400–2000 A · to 600 V AC · 4 weeks

  • 400 / 600 / 800 / 1200 / 1600 / 2000 A frames
  • Thermal-magnetic or LSIG electronic trip
  • Neutral bonding kit and label included
  • NEMA 1 / 3R / 4X
Full specifications →

How ordering works

Four steps, and none of them are a meeting.

  1. Send the requestThe form asks for the configuration, the enclosure type, the quantity, and where it ships.
  2. Get a date in 24 hoursA confirmed ship date comes back by email within one business day of the request.
  3. Release the orderApprove the date and the purchase order, and your unit is allocated to you out of stock.
  4. Delivered in 4 weeks or lessFinal configuration, test, and freight to your site anywhere in the continental US.

Order it in four weeks.

Send the request. You get a confirmed ship date back within 24 hours, and the gear is delivered within four weeks — usually sooner.

Or call (321) 624-3333.